Today my mentor, Pn Anisah came. We did a morning meeting in the office and after breakfast I was directed by Pn Anisah to follow Mr. Affendi (Planning engineer Assistant) to a site. We went to Taman Garing Utama, Rawang because there is a factory apply for electric supply. The factory's name is Hing Keong Engineering.
Below is the picture taken at the site:
from left: owner of the factory, Mr. Affendi, TNB technician.
The name of the factory
No. lot of the factory
in the factory
The nearest substation to the factory
After come back to the office, Mr. Mohd. Hafizi asked me to study on PSI in the TNB website. This evening, I have covered 2 topics that is ‘prosedur perancangan projek bekalan dan sistem 22kV dan ke bawah’ and ‘prosedur penyediaan distribution network master plan (DNMP)’ .
After that, I read ' electricity supply application handbook' and had covered topic 'metering guidelines'.
From the topic I have learned that meter is divide into 5 part that is:
- single phase metering (240V, 10A-100A)
- three phase whole current metering (415V, 10A-100A)
- group metering for whole current metering (for multi-tenanted premises)
- LVCT metering (more than 100A)
- medium and high voltage metering (current transformer (CTs) and potential transformer (PTs))
After that I'm going home =_+